12/15/2011 – 3 hours
Recieved some instructions from Larry and started on the pre-rotator today. Got the main housing drill and deburred and removed the powder coating from the bearing/plate surfaces. Installed the bendix shaft and secured with roll pin. Pressed bearings into end caps and completed bendix/housing/bearing assembly.
October 25-26, 2011 – 4 hours
Horizontal/Vertical Stabilizer arrived. Delivered to garage. Two bolts had to be replaced in the seat installation because of clearance problems (No big deal). Stabilizer uncrated and inspected. Will take a lot of prep to get the stab ready for finish paint. More parts on the way. Hope to get the engine bolted on this weekend.